The first alarm assignment arrived to heavy fire in the rear of the vacant dwelling and smoke throughout the seconnd floor. An additional egine and ladder were added to the box as crews accessed the second floor and attic to attack the fire. They would have an extended operation clearing the hotspots in the attic and rear porch of the building.